cage welding machine installation and debugging training conditions
cage welding machine installation and debugging training conditions
序号
安装要求installation requirements
客户确认client confirmation
1
厂房建设完成,具备行车或吊车(10 吨以上)等
The construction of the factory building is completed, and there are cranes or cranes (more than 10 tons), etc.
2
地面硬化达 48 小时以上,能平稳承重
Floor hardened for more than 48 hours, can bear smoothly
3
地面平整度良好,误差超过 1cm 需准备斜铁,超过10CM则必须找平
The flatness of the ground is good. If the error exceeds 1cm, you need to prepare inclined iron. If it exceeds 10CM, it must be leveled.
4
设备已经摆放到指定位置(28 *8 m)
The equipment has been placed in the designated position (28 * 8 m)
5
16平方3+2的电源线,能够对设备进行正常供电;
The 16 square 3+2 power cord can supply power to the device normally;
6
现场已正常供电。The site has normal power supply.
7
对应设备的生产材料(钢筋)到位
The production materials (rebars) of the corresponding equipment are in place
8
对应设备的受训(操作)人员(4-6 人)到位,并协助安装,技术员和电工到位
Trained (operating) personnel (4-6) for the corresponding equipment are in place to assist with installation, and technicians and electricians are in place
9
350 以上二保焊机,(1).二氧化碳气体 2 瓶,(2) 二保焊丝 1.2#2 盘,(3) 导电嘴1.2#1 盒,(4)保护嘴 350#1 盒(5)防堵剂 2 盒
350 or more second protection welding machine, (1) 2 bottles of carbon dioxide gas, (2) second protection welding wire 1.2#2 discs, (3) contact tip 1.2#1 box, (4) protection tip 350#1 box (5) Blocking agent 2 boxes
10
液压油(46 号 40L),机油5L、润滑脂5L
Hydraulic oil (46# 40L), oil 5L, grease 5L
11
(1)操作滚焊机的现场工人到位约需 5 人;
(2)所需加工笼子的相关数据已下达,进行导管固定;
(3)所需加工产品的主筋和盘筋到位,主筋需进行对丝连接的,已套丝;
(1) It takes about 5 on-site workers to operate the seam welding machine;
(2) The relevant data of the required processing cage has been issued, and the catheter is fixed;
(3) The main rib and coil rib of the product to be processed are in place, and the main rib needs to be connected by wire, and the wire has been covered;